|
ECO-3 Protecting Our Soil, Water & Air Erosion & Sediment Control Training & Site Supervision
|
|
You may want to purchase 3 hole paper for printing. All participants should print the DOE Manual and blank report. Then print the appropriate manual for the jurisdiction you most commonly work in. The King County Manual is used by many jurisdictions and is a good reference. For all participants: Blank Erosion Control Inpection Report (Word Doc) Hazardous Spill Notification List (Word Doc) DOE 2005 Stormwater Management Manual for Western Washington Volume I - Minimum Technical Requirements and Site Planning - 195 pages optional Volume II - Construction Stormwater Pollution Prevention - 175 pages Volume III - Hydrologic Analysis and Flow Control Design/BMPs - 178 pages optional Volume IV - Source Control BMPs - 149 pages optional Volume V - Runoff Treatment BMP - 299 pages optional King County Erosion & Sediment Control Standards - Appendix D - 75 pages Pierce County Reg 17a Pierce County Reg 18a WSDOT Information |
Copyright © 2002
ECO-3
|